Manufacturer Part | PDU3VN10L1530 |
---|---|
Manufacturer | Tripp Lite |
Description | PDU 3-PHASE MONITORED 208V 8.6KW |
Category | Line Protection, Distribution, Backups |
Family | Power Distribution, Surge Protectors |
Lifecycle: | New from this manufacturer. |
Delivery: | DHL FedEx Ups TNT EMS |
Payment | T/T Paypal Visa MoneyGram Western Union |
DataSheet | PDU3VN10L1530 PDF |
InStock | 822,219 |
---|---|
UnitPrice | $ 0.00000 |
PDU3VN10L1530 Current price of is for reference only, if you want to get best price, please submit a inquiry or direct email to our sales team rfq@www.zhschip.com
Type | Description |
---|---|
Series: | - |
Package: | Bulk |
Part Status: | Obsolete |
Type: | PDU (Power Distribution Unit) |
Mounting Type: | Rack, Vertical |
Current - Max: | 24A |
Region Utilized: | - |
Overload Protection: | Circuit Breaker(s) |
Connector - AC Input: | NEMA L15-30P |
Connector - AC Output: | IEC 320-C13 (30), C19 (6) |
Voltage - Input: | 208V |
Housing Material: | Steel |
Media Lines Protected: | - |
AC Outlets: | 36 |
Energy: | - |
Cord Length: | 10' (3.05m) |
Approval Agency: | NOM, UL |
Features: | Load Meter |
We ship orders once a day around 5 p.m., except Sundays. Once shipped, the estimated delivery time depends on the courier company you choose, usually 5-7 working days.
We provide DHL, FedEx, UPS, EMS, SF Express, and Registered Air Mail international shipping.
TT in advance (bank transfer), Western Union,PayPal. Customer is responsible for shipping fee, bank charges, duties and taxes.
Copyright © 2024 ZHONG HAI SHENG TECHNOLOGY LIMITED All Rights Reserved.